Ask a room of engineers to explain the difference between a WPS and a PQR and the answers will vary more than they should. These documents are the legal and technical foundation of every code weld, yet they are frequently misunderstood, misapplied or confused. A clear understanding of how welding procedures are qualified prevents both quality failures and costly requalification.
The WPS is the instruction to the welder. It specifies the ranges of variables to be used in production: process, base metal groupings, filler metal, thickness range, joint design, position, preheat and interpass temperature, postweld heat treatment (PWHT), shielding gas, and electrical characteristics. It is written in terms of permitted ranges, not single values.
The PQR is the evidence. It records the actual variables used when welding a test coupon and the results of the mechanical tests performed on it. A PQR is a historical record of what was done and what was achieved; it should not be revised to change the variables used, although editorial corrections and additional supporting information are permitted under ASME Section IX.
The WPQ demonstrates that an individual welder or welding operator can deposit sound weld metal using a qualified procedure. Procedure qualification proves the procedure can produce welds with the required properties; performance qualification proves the person can produce sound welds.
| Document | Answers the question | Content |
|---|---|---|
| WPS | How should this weld be made? | Ranges of variables for production |
| PQR | Does this procedure produce acceptable properties? | Actual test variables and mechanical test results |
| WPQ | Can this welder make sound welds? | Welder identity, variables qualified, test results |
ASME Boiler and Pressure Vessel Code, Section IX, Welding, Brazing, and Fusing Qualifications, is referenced by ASME Section I, Section VIII, ASME B31.1, ASME B31.3 and many other codes. Its logic rests on classifying each welding variable by its effect on the weldment.
To keep the number of qualifications manageable, Section IX groups materials. Base metals are assigned P-Numbers (and Group Numbers within them) based on composition, weldability and mechanical properties. Filler metals are grouped by F-Numbers according to usability characteristics, and weld metal chemical composition is classified by A-Numbers. Qualifying on one P-Number can qualify others under the rules in Section IX.
For groove welds, Section IX typically requires tension tests to verify strength and guided bend tests to verify ductility and soundness. Notch-toughness tests are added when the referencing code requires them. The coupon thickness determines the range of base metal and deposited weld metal thickness qualified, according to the tables in QW-451; for many common coupon thicknesses, the maximum qualified thickness is twice the coupon thickness.
Welders may be qualified by mechanical bend tests or, for certain processes and materials, by volumetric examination. Section IX also contains continuity provisions: a welder's qualification for a process lapses if that process has not been used within a specified period, which is six months under the general rules, unless continuity is maintained as permitted by the code.
A WPS tells the welder what to do. The PQR proves that doing it works. Neither substitutes for the other, and neither substitutes for a qualified welder.
AWS D1.1, Structural Welding Code — Steel, governs welded steel structures such as buildings and many industrial structures. It offers two routes to an approved WPS:
Even with a prequalified WPS, AWS D1.1 still requires welders to be qualified. A prequalified procedure removes the need for a PQR, not the need for competent welders.
Pipeline welding in the United States commonly follows API Standard 1104, which has its own procedure and welder qualification requirements. Internationally, procedure qualification is often performed to ISO 15614-1. Standard Welding Procedure Specifications published by AWS under the AWS B2.1 framework can be adopted within their stated limits in certain applications. The engineer must always confirm which qualification code the contract or jurisdiction requires.